Free G702/G703-Style Pay Application Generator
Build this month's application for payment from your schedule of values. Enter percent complete, stored materials, change orders and your retainage terms, and every summary figure updates as you type. Download the PDF and send it to your general contractor.
This is an independent G702/G703-style template. It is not an official AIA document and is not affiliated with or endorsed by AIA. Official AIA forms are available from AIA Contract Documents.
| Item | Description | Scheduled value | Previous % | This period % | Stored materials | % to date | Completed & stored | Remove |
|---|---|---|---|---|---|---|---|---|
| 1 | 100.0% | $9,000.00 | ||||||
| 2 | 85.0% | $61,200.00 | ||||||
| 3 | 50.0% | $27,000.00 | ||||||
| 4 | 18.9% | $8,500.00 | ||||||
| Approved change orders | ||||||||
| CO-1 | 50.0% | $3,250.00 | ||||||
| Total | $186,500.00 | $4,000.00 | 58.4% | $108,950.00 | ||||
Application #4Summary
To download, fill in the period.
Completed and stored to date is each line's scheduled value times its percent complete (previous plus this period), rounded to the cent, plus materials stored.
Retainage is your rate on each line's completed work and stored materials, rounded per line and then totalled, the way a G703 shows it. With a step-down, the lower rate starts once line 4 reaches that share of line 3.
Previous certificates are the work at each line's previous percent, less retainage on it. Current payment due is line 6 minus line 7.
Change orders add to the contract sum on line 2 and appear as their own lines on the continuation sheet.
How to fill in each section
Your company, the GC and the project
Use your legal company name and the general contractor's name as they appear on the subcontract, and the project name the GC uses. A GC that matches applications to jobs by name will send back one it can't place.
Application number and period
Number applications in order from 1 and never skip or reuse a number. The period is the last day of the billing month, usually the date in your subcontract (often the 25th or the end of the month).
Original contract sum and change orders
The original contract sum is your subcontract amount before any change orders. The lines of your schedule of values must add up to it exactly. Add each approved change order as its own line under Approved change orders, with a negative amount for a deduct. They make up line 2, and the contract sum to date on line 3 includes them. Leave pending change orders off until they are approved.
Retainage
Use the rate in your subcontract, often 10% or 5%. If it drops partway through the job, tick the step-down box and enter the lower rate and the percent complete where it starts. Choose "on new work only" when the retainage already held stays held, or "on all retainage held" when the GC releases the excess once the job reaches that point.
Schedule of values
Enter one row per line of the schedule of values the GC approved, with its scheduled value. Previous % is the percent complete billed on earlier applications; this period % is the progress since. Stored materials are materials delivered and paid for but not yet installed, as a dollar amount. Once they're installed, take them out of stored materials and bill them in this period %.
Check the summary
Line 8, current payment due, is what you're asking for this month. Compare line 7 with what the GC certified on your last application before you send it.
Common mistakes
- A schedule of values that doesn't add up to the contract sum, often after a change order was added to a line instead of its own line.
- Billing a pending change order before it's approved.
- Previous % that doesn't match what the GC approved last month, so line 7 differs from their records.
- Billing materials as stored and installed in the same month, which counts them twice.
- Retainage at the wrong rate, or a step-down applied before the job reaches the contract's threshold.
- Skipping or reusing an application number, or a period that doesn't match the billing cycle.
- Forgetting the signature, notarization or lien waiver your GC asks for with each application.
Frequently asked questions
Is this an official AIA form?
No. This is an independent G702/G703-style template. It is not an official AIA document and is not affiliated with or endorsed by AIA. Official AIA forms are available from AIA Contract Documents. The PDF uses our own layout and wording; it follows the same order of figures so a general contractor can check it against their own records.
How is retainage calculated?
Retainage is your rate times the work completed and materials stored to date on each line, rounded to the cent per line and then totalled. With a step-down, the lower rate starts once the job reaches the percent complete in your contract, either on new work only or on all retainage held. Current payment due is what you have earned less retainage, minus what earlier applications already certified.
What is the difference between a G702 and a G703?
The G702-style page is the one-page summary: contract sum, change orders, work completed and stored to date, retainage, previous certificates and the current payment due. The G703-style continuation sheet behind it lists every line of the schedule of values with its scheduled value, work from previous applications, work this period, materials stored, percent complete, balance to finish and retainage.
Can I use it with QuickBooks?
The generator makes a PDF to send to your general contractor; it doesn't connect to QuickBooks. The free RetainageBack retainage report ages your retainage by GC and job from the pay apps you upload. Matching received payments to pay apps is part of the paid plans: for now you import the payments from a QuickBooks export (CSV), and then you see what each GC has paid and the retainage still owed.